Glass door fittings require coordination with the glass specification and cutout drawings. A small difference in preparation can prevent a fitting from seating correctly. Ordering hardware after the glass has been processed may leave fewer practical options than selecting and approving the complete arrangement first.
Establish the system
Provide the glass type and thickness specified by the responsible designer, leaf size, opening arrangement and adjacent construction. Identify whether the system uses patch fittings, rails, pivots or another assembly. Ask the hardware supplier for the exact preparation drawings for the proposed model.
Coordinate connected components
The top support, bottom fitting, floor spring or pivot and lock must work together. Confirm who supplies each component and whether the proposal is a manufacturer-approved combination. Avoid assuming that similar-looking fittings from different catalogues share dimensions or operating limits.
Release checklist
- Approved hardware model and glass preparation drawing.
- Confirmed support and fixing details.
- Clear opening direction and required clearances.
- Included gaskets, covers, fasteners and accessories.
Glass design and installation should be reviewed by qualified project specialists. Procurement checks can establish that the ordered components match an approved arrangement; they do not replace structural assessment. Hold final glass fabrication until the relevant dimensions and fitting interfaces have been confirmed in writing.
AN Sourcing buying notes. These are practical procurement checklists; specifications, service scope and destination requirements should be confirmed for the actual order.